Scope: Demolishing of excisting innercore, fabrication of new innercore and installation on excisting carousel
Location: Greenport Terminal
Time: 2 months
Team: 5-10 pers.
+31 (0)10 261 33 30
info@q3-group.com
Scope: Demolishing of excisting innercore, fabrication of new innercore and installation on excisting carousel
Location: Greenport Terminal
Time: 2 months
Team: 5-10 pers.
This time, we were asked by Europoort Construction B.V. to assist in relocating the structure of the pontoon shown. The pontoon is almost fully assembled, but still needs several sections to be added. To make this possible, we first had to lift and move the already...
Q3 Heavy Lift proudly supported Mammoet-Giant with a unique and complex operation in the Port of Kaohsiung, Taiwan. ๐ As barge master, we played a key role in maneuvering the barge SL8 underneath the Jack-Up Barge Apolloโa task that required both precision and close...
When one of our valued clients come to us with a challenge, we were to assist. As this Monopile manufacturer experienced a lack of storage on their yard they were looking for more space. However this additional space was across the water, meaning the Monopiles needed...