Upgrade TLS on board of the Pioneering Spirit

Q3 Heavy Lift is requested to assist Allseas, one of the major offshore pipelay and subsea construction companies in the world, in the upgrade of the Topside Lifting System (TLS) on board of their vessel the Pioneering Spirit.

It is always a pleasure to work directly with the largest, most versatile offshore construction vessel in the world, the Pioneering Spirit (PS). Our CC2800-1, a crawler crane with 600 tons lifting capacity, is fully operational on the Iron Lady, the special-purpose cargo barge that supports PS. Together with various organizations and vessel crew we are assisting Allseas with its TLS upgrade on the PS.

A nice cooperation in which our expertise and experience on board this vessel is of great use.

Moving barge SL8 underneath JUB Apollo

Moving barge SL8 underneath JUB Apollo

Q3 Heavy Lift proudly supported Mammoet-Giant with a unique and complex operation in the Port of Kaohsiung, Taiwan. 🌏 As barge master, we played a key role in maneuvering the barge SL8 underneath the Jack-Up Barge Apolloβ€”a task that required both precision and close...

MP RoRo Operation and Barge Transport

MP RoRo Operation and Barge Transport

When one of our valued clients come to us with a challenge, we were to assist. As this Monopile manufacturer experienced a lack of storage on their yard they were looking for more space. However this additional space was across the water, meaning the Monopiles needed...

SPMT Transport of Main Frames

SPMT Transport of Main Frames

π†π„π“π“πˆππ† π“π‡πˆππ†π’ πƒπŽππ„ πŸš›πŸ’ͺ Transporting three main frames of 155 tons each is no easy task - especially when the route itself is a challenge! πŸš› To make this transport possible, our team had to remove traffic signs and obstacles along the way, ensuring a safe and efficient...