Removal 500 Ts bridge

For the removal of this 500 Tons bridge in Berlin, Germany we were asked to provide technical assistance on site. Our service technician Pascal Hilgers has been on site during the operation and assisted Autokrane Schares GmbH and COMETTO Propelled to the MAX with the safe removal.

Another job of GETTING THINGS DONE.

Lifting support for maintenance project in Rotterdam

Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...