Removal 500 Ts bridge

For the removal of this 500 Tons bridge in Berlin, Germany we were asked to provide technical assistance on site. Our service technician Pascal Hilgers has been on site during the operation and assisted Autokrane Schares GmbH and COMETTO Propelled to the MAX with the safe removal.

Another job of GETTING THINGS DONE.

MP RoRo Operation and Barge Transport

MP RoRo Operation and Barge Transport

When one of our valued clients come to us with a challenge, we were to assist. As this Monopile manufacturer experienced a lack of storage on their yard they were looking for more space. However this additional space was across the water, meaning the Monopiles needed...

SPMT Transport of Main Frames

SPMT Transport of Main Frames

π†π„π“π“πˆππ† π“π‡πˆππ†π’ πƒπŽππ„ πŸš›πŸ’ͺ Transporting three main frames of 155 tons each is no easy task - especially when the route itself is a challenge! πŸš› To make this transport possible, our team had to remove traffic signs and obstacles along the way, ensuring a safe and efficient...

Engineering and 3D Modeling

Engineering and 3D Modeling

One of our specialties is engineering and 3D modeling. πŸ“Great to see our designs contribute to innovative maritime solutions, like these 30m spud-poles for Brabo Maritime Services! After many hours of Engineering for our client Brabo Maritime Services, we have drawn...