For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames.
To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts mobile crane, experienced crane operator and dedicated rigging team, the lifting operation was executed with a strong focus on safety, precision and coordination.
Through detailed planning and close cooperation with our client, their maintenance team was provided with safe acces to perform the required repairs while minimizing disruption to ongoing operations.
This project demonstrates how the combination of specialized lifting equipment, skilled personnel and a safety-firs approach helps our clients to succesfully execute complex operations.