Grillage Design Monopile

Scope:   Engineering of grillage support for   monopile transport and addition   fabrication and execution

Location:  SIF Terminal Rotterdam               

Time:   2019

Team:    Engineering and execution team

Lifting support for maintenance project in Rotterdam

Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...