Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames.

To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts mobile crane, experienced crane operator and dedicated rigging team, the lifting operation was executed with a strong focus on safety, precision and coordination.

Through detailed planning and close cooperation with our client, their maintenance team was provided with safe acces to perform the required repairs while minimizing disruption to ongoing operations.

This project demonstrates how the combination of specialized lifting equipment, skilled personnel and a safety-firs approach helps our clients to succesfully execute complex operations.

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...

Over the Easter Weekend: First grillage successfully relocated

Over the Easter Weekend: First grillage successfully relocated

During the Easter weekend, we successfully carried out the relocation of the first of four grillages at the construction facility of Wimorost in Moerdijk, moving it from the fabrication hall. The grillage measured 47.9 meters in length and weighed 264 tons, making...