MP RoRo Operation and Barge Transport

When one of our valued clients come to us with a challenge, we were to assist. As this Monopile manufacturer experienced a lack of storage on their yard they were looking for more space. However this additional space was across the water, meaning the Monopiles needed to be transported over water. That is where we came in.

Our trained and experienced SPMT crew are performing RoRo operations to transport the newly fabricated monopiles to the additional storage yard. Their monopile, with a length of 84 meters and a weight of 1,160 tons, was transported using a 2 x 24 axle lines SPMT configuration with the in-house designed Q3 foldable transport saddles. More monopiles to be transported are yet to come.

Lifting support for maintenance project in Rotterdam

Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...