โœ… โ€œ๐’๐ฆ๐š๐ซ๐ญ ๐Œ๐จ๐ฏ๐ž๐ฌ ๐Ÿ๐จ๐ซ ๐‡๐ž๐š๐ฏ๐ฒ ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐ž๐ฌโ€๐Ÿšข

This time, we were asked by Europoort Construction B.V. to assist in relocating the structure of the pontoon shown. The pontoon is almost fully assembled, but still needs several sections to be added.

To make this possible, we first had to lift and move the already finished part about 10 to 15 meters backwards. This section measured approximately 64 meters in length, 23,5 meters in width, and weighed around 1.700 tons.

After attaching the new sections, we moved the entire structure forward again, now measuring about 80 meters long and still 23,5 meters wide.

We carried out this job using 2 x 22 axle lines and, of course, our skilled and experienced operators! ๐Ÿš€

When fully completed, the pontoon will reach an impressive 95 meters in length and 23,5 meters in width.

Great teamwork and a nice challenge to add to our portfolio! ๐Ÿ’ชโš™๏ธ

#EuropoortConstruction #NewlyBuild #Pontoon #Impressive #TeamWork #Q3Group #HeavyTransport #HeavyLift #SPMT #Operators #GETTINGTHINGSDONE

Evening transport operation – lifting over obstacles without removal

Evening transport operation – lifting over obstacles without removal

We are proud to share another successful transport operation completed using our custom-made equipment and expertise. ๐ŸšจThis evening transport is part of a larger project, which also includes the transport of steel structures as previously shared.During this operation,...

Over the Easter Weekend: First grillage successfully relocated

Over the Easter Weekend: First grillage successfully relocated

During the Easter weekend, we successfully carried out the relocation of the first of four grillages at the construction facility of Wimorost in Moerdijk, moving it from the fabrication hall. The grillage measured 47.9 meters in length and weighed 264 tons, making...

Precision Transport, Even in the Coldest Nights

Precision Transport, Even in the Coldest Nights

Last weekend marked the coldest night in years, but that didnโ€™t stop the Q3 crew from GETTING THINGS DONE.In the most extreme conditions, our team successfully transported 8 impressive steel structures; each approx. 18 meters high and weighing around 250 tons, for our...