This time, we were asked by Europoort Construction B.V. to assist in relocating the structure of the pontoon shown. The pontoon is almost fully assembled, but still needs several sections to be added.

To make this possible, we first had to lift and move the already finished part about 10 to 15 meters backwards. This section measured approximately 64 meters in length, 23,5 meters in width, and weighed around 1.700 tons.

After attaching the new sections, we moved the entire structure forward again, now measuring about 80 meters long and still 23,5 meters wide.

We carried out this job using 2 x 22 axle lines and, of course, our skilled and experienced operators! 🚀

When fully completed, the pontoon will reach an impressive 95 meters in length and 23,5 meters in width.

Great teamwork and a nice challenge to add to our portfolio! 💪⚙️

Lifting support for maintenance project in Rotterdam

Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...