Scope: Modification of a existing loading tower and execution of the spooling operation
Location: –
Time: 2019
Team: Engineering and spooling operator
+31 (0)10 261 33 30
info@q3-group.com
Scope: Modification of a existing loading tower and execution of the spooling operation
Location: –
Time: 2019
Team: Engineering and spooling operator
For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...
Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...
We are proud to share another successful transport operation completed using our custom-made equipment and expertise. 🚨This evening transport is part of a larger project, which also includes the transport of steel structures as previously shared.During this operation,...