Sustainable launching of Pontoon NP631

Before the start of the (now) newbuild Pontoon NP631 of 60 x 22 meters Neptune Marine asked us to assist them in the sunstainable launching of this pontoon. We researched the possibility of such a launch and investigated which airbags are best to be used. In addition we procured these airbags and made sure they were deliverd to Neptune on time.

And then there was the big day; the launching of the Pontoon. It was a succesfull launch and the EuroPontoon is now ready for action.

Over the Easter Weekend: First grillage successfully relocated

Over the Easter Weekend: First grillage successfully relocated

During the Easter weekend, we successfully carried out the relocation of the first of four grillages at the construction facility of Wimorost in Moerdijk, moving it from the fabrication hall. The grillage measured 47.9 meters in length and weighed 264 tons, making...

Precision Transport, Even in the Coldest Nights

Precision Transport, Even in the Coldest Nights

Last weekend marked the coldest night in years, but that didn’t stop the Q3 crew from GETTING THINGS DONE.In the most extreme conditions, our team successfully transported 8 impressive steel structures; each approx. 18 meters high and weighing around 250 tons, for our...