Sustainable launching of Pontoon NP631

Before the start of the (now) newbuild Pontoon NP631 of 60 x 22 meters Neptune Marine asked us to assist them in the sunstainable launching of this pontoon. We researched the possibility of such a launch and investigated which airbags are best to be used. In addition we procured these airbags and made sure they were deliverd to Neptune on time.

And then there was the big day; the launching of the Pontoon. It was a succesfull launch and the EuroPontoon is now ready for action.

Lifting support for maintenance project in Rotterdam

Lifting support for maintenance project in Rotterdam

For a maintenance project in Rotterdam, Q3 was requested to assist with the lifting and temporary positioning of PUG-frames. To enable safe and efficient repair activities, the frames were carefully lifted and placed on temporary support blocks. Using our 150 ts...

Not every assignment requires a large-scale operation.

Not every assignment requires a large-scale operation.

Succesful heavy transport is not always about the size of the team involved. Often, it comes down to having the right person in the right place at the right time. During a recent transport operation, Q3 Group supported the project providing an experienced SPMT...