Upgrade TLS on board of the Pioneering Spirit

Q3 Heavy Lift is requested to assist Allseas, one of the major offshore pipelay and subsea construction companies in the world, in the upgrade of the Topside Lifting System (TLS) on board of their vessel the Pioneering Spirit.

It is always a pleasure to work directly with the largest, most versatile offshore construction vessel in the world, the Pioneering Spirit (PS). Our CC2800-1, a crawler crane with 600 tons lifting capacity, is fully operational on the Iron Lady, the special-purpose cargo barge that supports PS. Together with various organizations and vessel crew we are assisting Allseas with its TLS upgrade on the PS.

A nice cooperation in which our expertise and experience on board this vessel is of great use.

Over the Easter Weekend: First grillage successfully relocated

Over the Easter Weekend: First grillage successfully relocated

During the Easter weekend, we successfully carried out the relocation of the first of four grillages at the construction facility of Wimorost in Moerdijk, moving it from the fabrication hall. The grillage measured 47.9 meters in length and weighed 264 tons, making...

Precision Transport, Even in the Coldest Nights

Precision Transport, Even in the Coldest Nights

Last weekend marked the coldest night in years, but that didn’t stop the Q3 crew from GETTING THINGS DONE.In the most extreme conditions, our team successfully transported 8 impressive steel structures; each approx. 18 meters high and weighing around 250 tons, for our...