We are most excited to share our big news; as of the start of 2023 we are handling all operational activities for the onshore inbound and outbound transport of monopiles and secondary steel for the Gode Wind 03 & the Borkum Riffgrund 03 project at the newly developed BOW Terminal located in Eemshaven, The Netherlands. Together with our partners we facilitate and operate the load-in and load-out of 106 WTG foundations, 1 Offshore Substation foundation and all complimentary Secundary Steel. A 24/7 operation which we are performing with our dedicated team of specialists.
 
Both windfields will be located in the German North Sea and generate approximately enough electricity for 1,2 million German households for a year.
 
We are happy to be able to contribute to the worldwide ambitions for the offshore wind energy transition.

https://www.offshorewind.biz/2023/02/06/jan-de-nul-picks-bow-terminal-eemshaven-as-gode-wind-3-and-borkum-riffgrund-3-marshalling-yard/

#offshorewind #windenergy #eemshaven #thenetherlands #germannorthsea #offshore #onshore #monopiles #foundations #substation #secundarysteel #loadin #loadout #operations #heavytransport #heaylift #q3group #jandenulgroup #bowterminal #renewableenergy #energytransition