Evening transport operation – lifting over obstacles without removal

We are proud to share another successful transport operation completed using our custom-made equipment and expertise. ๐Ÿšจ

This evening transport is part of a larger project, which also includes the transport of steel structures as previously shared.

During this operation, two tanks were safely transported using spreaders and stools on our SPMT, ensuring safe and controlled execution. The largest white tank, with a diameter of 11 meters, was raised using a combination of spreaders and stools to safely pass several obstacles on site, without needing to remove them.

In addition, the grey tank with a diameter of 7 meters was also successfully transported.

By combining engineering expertise and specialized equipment, both transports were carried out safely and efficiently.

We would like to thank Trans Global Projects (TGP) for the trust and all colleagues and partners involved for their commitment and cooperation during this great project. ๐Ÿ‘

Over the Easter Weekend: First grillage successfully relocated

Over the Easter Weekend: First grillage successfully relocated

During the Easter weekend, we successfully carried out the relocation of the first of four grillages at the construction facility of Wimorost in Moerdijk, moving it from the fabrication hall. The grillage measured 47.9 meters in length and weighed 264 tons, making...

Precision Transport, Even in the Coldest Nights

Precision Transport, Even in the Coldest Nights

Last weekend marked the coldest night in years, but that didnโ€™t stop the Q3 crew from GETTING THINGS DONE.In the most extreme conditions, our team successfully transported 8 impressive steel structures; each approx. 18 meters high and weighing around 250 tons, for our...

โœ… โ€œ๐’๐ฆ๐š๐ซ๐ญ ๐Œ๐จ๐ฏ๐ž๐ฌ ๐Ÿ๐จ๐ซ ๐‡๐ž๐š๐ฏ๐ฒ ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐ž๐ฌโ€๐Ÿšข

โœ… โ€œ๐’๐ฆ๐š๐ซ๐ญ ๐Œ๐จ๐ฏ๐ž๐ฌ ๐Ÿ๐จ๐ซ ๐‡๐ž๐š๐ฏ๐ฒ ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐ž๐ฌโ€๐Ÿšข

This time, we were asked by Europoort Construction B.V. to assist in relocating the structure of the pontoon shown. The pontoon is almost fully assembled, but still needs several sections to be added. To make this possible, we first had to lift and move the already...